These requirements are based upon (but not limited to) Chapter 1, sections 110.7, 110.10 and 111.0 of the Massachusetts State Building Code.
NEW HOMES, ADDITIONS, RENOVATIONS
- Fill out the building permit application (both sides).
- Include two copies of a complete set of framing plans, showing how the floor, walls, ceiling, roof, etc. is being framed. No cross sections. Also include a foundation plan showing the thickness of walls, and the location of windows or vents.
- Include the floor plan of all levels of the house, including the basement, with each room clearly marked as to its use.
- For new homes and additions, a copy of the MEC check is to be submitted.
- For remodeling jobs, the plan should indicate the areas of where the work is to occur and a framing plan (as listed in Item #2).
- All areas that are to be insulated are to be indicated and to be marked as to their R-value.
- A plot plan to scale (not hand drawn) is to be submitted with the application, clearly showing the exact location of the proposed project. Check with the Board of Health for a plan.
SHEDS, DECKS
- Fill out the building permit application (both sides).
- Two copies of a complete set of framing plans, showing how the floor, walls, roof, etc. is being framed for the shed.
- For a deck, the plans are to show the framing of the deck, the size of the footings, the depth of the footings, and the railing with the balusters.
- A plot plan to scale (not hand drawn) is to be submitted with the application, clearly showing the exact location of the proposed project. Check with the board of Health for a plan.
SWIMMING POOLS
- NO Swimming Pool permit shall be issued until the electrical permit is also applied for.
- A plot plan to scale (not hand drawn) is to be submitted with the application, clearly showing the exact location of the proposed project. Check with the board of Health for a plan
REVIEW TIME
In accordance with Massachusetts State building Code, Chapter1, Section 111.1, the Inspector has thirty (30) days to review a permit application. This office aims for a turnaround period of within two (2) weeks of receiving the application. FAXED SIGNATURES ARE NOT ACCEPTABLE.
|